Schuylkill River Trail
Subject
Subject Source: Local sources
Found in 52 Collections and/or Records:
Drawings for Construction of Schuylkill river Park Trail in Philadelphia County; Cover Sheet, general information and contents list (I) 1-86 Locust Street to South Street 22 span composite p/s concrete PA bulb-tee beam bridge;(II)1-34 South Street ramp to Schuylkill River Park Trail 4 span composite p/s concrete box beam bridge; (III)1-7 Cross sections; (IV)1-5 Pavement marking plan; (V)1-2 Signing plan; (VI)1-8 Erosion and sediment pollution control plan; (VII)1-14 Roadside development plan; (VIII)1-12 Post construction stormwater; (IX)1-6 Management plan, pedestrian lighting plan, existing structure plan. [173 sheets], 2011 May 5
Item — Drawer M-8, Folder: 3
Scope and Contents
From the Collection:
Collection includes maps, plans, and drawings related to recreational trail networks operated by the Philadelphia Parks and Recreation Department.
The collection contains a variety of document types, including surveys, master plans, construction documents, and landscaping plans. The bulk of the items in this collection range in date from 1994 to 2019.
Dates:
2011 May 5
Fairmount Park System, Schuylkill River Trail: Bartram's Garden - Aerial study, construction documents & correspondence, 2009-2012
File — Drawer 8.3
Dates:
2009-2012
Fairmount Park System, Schuylkill River Trail: Bartram's Garden meeting minutes and correspondence, 2010-1012
File — Drawer 8.3
Dates:
2010-1012
Fairmount Park System, Schuylkill River Trail: Christian to Crescent Project, 2018
File — Drawer 8.3
Dates:
2018
Fairmount Park System, Schuylkill River Trail: Falls Bridge to Ridge Ave. Applications and Ordinance re: SEPTA land easement, 2003-2007
File — Drawer 8.3
Dates:
2003-2007
Fairmount Park System, Schuylkill River Trail: Falls Bridge to Ridge Ave. Construction Bid Proposals and DBE Compliance, 1998, 2010
File — Drawer 8.3
Dates:
1998; 2010
Fairmount Park System, Schuylkill River Trail: Falls Bridge to Ridge Ave. Meeting Minutes and Correspondence, 2006-2012
File — Drawer 8.3
Dates:
2006-2012
Fairmount Park System, Schuylkill River Trail: Falls Bridge to Ridge Ave. Signage Project, Copy of Trail Agreement, Misc. Images, 2010 2011
File — Drawer 8.3
Dates:
2010 2011
Fairmount Park System, Schuylkill River Trail: General information, 2008-2012
File — Drawer 8.3
Dates:
2008-2012
Fairmount Park System, Schuylkill River Trail: Grant - ISTEA grant information & application, 1992-2006
File — Drawer 8.3
Dates:
1992-2006