Schuylkill Banks
     Subject 
  
        Subject Source: Local sources
      
        Scope Note: Schuylkill River Trail
        Found in 57 Collections and/or Records:
Drawings for Construction of Schuylkill river Park Trail in Philadelphia County; Cover Sheet, general information and contents list (I) 1-86 Locust Street to South Street 22 span composite p/s concrete PA bulb-tee beam bridge;(II)1-34 South Street ramp to Schuylkill River Park Trail 4 span composite p/s concrete box beam bridge; (III)1-7 Cross sections; (IV)1-5 Pavement marking plan; (V)1-2 Signing plan; (VI)1-8 Erosion and sediment pollution control plan; (VII)1-14 Roadside development plan; (VIII)1-12 Post construction stormwater; (IX)1-6 Management plan, pedestrian lighting plan, existing structure plan, 2011 May 5
     Item  — Drawer M-8, Folder: 3
  
Scope and Contents
              From the Collection:
	     
      Collection includes maps, plans, and drawings related to recreational trail networks operated by the Philadelphia Parks and Recreation Department.
The collection contains a variety of document types, including surveys, master plans, construction documents, and landscaping plans. The bulk of the items in this collection range in date from 1994 to 2019.
          Dates: 
        2011 May 5
      
      
   Fairmount Park System, Schuylkill River Trail: Bartram's Garden - Aerial study, construction documents & correspondence, 2009-2012
     File  — Drawer 8.3
  
          Dates: 
        2009-2012
      
      
   Fairmount Park System, Schuylkill River Trail: Bartram's Garden meeting minutes and correspondence, 2010-1012
     File  — Drawer 8.3
  
          Dates: 
        2010-1012
      
      
   Fairmount Park System, Schuylkill River Trail: Christian to Crescent Project, 2018, 2025
     File  — Drawer 8.3
  
          Dates: 
        2018; 2025
      
      
   Fairmount Park System, Schuylkill River Trail: Falls Bridge to Ridge Ave. Applications and Ordinance re: SEPTA land easement, 2003-2007
     File  — Drawer 8.3
  
          Dates: 
        2003-2007
      
      
   Fairmount Park System, Schuylkill River Trail: Falls Bridge to Ridge Ave. Construction Bid Proposals and DBE Compliance, 1998, 2010
     File  — Drawer 8.3
  
          Dates: 
        1998; 2010
      
      
   Fairmount Park System, Schuylkill River Trail: Falls Bridge to Ridge Ave. Meeting Minutes and Correspondence, 2006-2012
     File  — Drawer 8.3
  
          Dates: 
        2006-2012
      
      
   Fairmount Park System, Schuylkill River Trail: Falls Bridge to Ridge Ave. Signage Project, Copy of Trail Agreement, Misc. Images, 2010 2011
     File  — Drawer 8.3
  
          Dates: 
        2010 2011
      
      
   Fairmount Park System, Schuylkill River Trail: General information, 2008-2012
     File  — Drawer 8.3
  
          Dates: 
        2008-2012
      
      
   Fairmount Park System, Schuylkill River Trail: Grant - ISTEA grant information & application, 1992-2006
     File  — Drawer 8.3
  
          Dates: 
        1992-2006
      
      
   