Skip to main content

58th Street Greenway

 Subject
Subject Source: Local sources

Found in 7 Collections and/or Records:

58th Street Greenway. Design Charrette: showing approx. Cobb's Creek Park to Schuylkill River and 53rd Street to 59th Street. [1 sheet], 2009 December 03

 Item — Drawer M-7, Folder: 1
Scope and Contents From the Collection:

Collection includes maps, plans, and drawings related to recreational trail networks operated by the Philadelphia Parks and Recreation Department.

The collection contains a variety of document types, including surveys, master plans, construction documents, and landscaping plans. The bulk of the items in this collection range in date from 1994 to 2019.

Dates: 2009 December 03

58th Street Greenway. Map showing 58th and 59th Streets from Cobb's Creek Parkway to Lindberch Avenue. Highlighting: PWD Infiltration Trench, Meyer Rec Center, Presbyterian Apts, Save-A-Lot, and Bartram's Field. [1 Sheet], n.d.

 Item — Drawer M-7, Folder: 1
Scope and Contents From the Collection:

Collection includes maps, plans, and drawings related to recreational trail networks operated by the Philadelphia Parks and Recreation Department.

The collection contains a variety of document types, including surveys, master plans, construction documents, and landscaping plans. The bulk of the items in this collection range in date from 1994 to 2019.

Dates: n.d.

58th Street Greenway. Plan: Cover with location plan map; existing cross section with 2 proposed cross sections; 2 sheets of artistic renderings; concept design character; existing conditions. [6 sheets], 2010 January 28

 Item — Drawer M-7, Folder: 1
Scope and Contents From the Collection:

Collection includes maps, plans, and drawings related to recreational trail networks operated by the Philadelphia Parks and Recreation Department.

The collection contains a variety of document types, including surveys, master plans, construction documents, and landscaping plans. The bulk of the items in this collection range in date from 1994 to 2019.

Dates: 2010 January 28

58th Street Greenway. Signing and Pavement Marking Plan. Half size. [24 sheets; 12 unique sheets], n.d.

 Item — Drawer M-7, Folder: 1
Scope and Contents From the Collection:

Collection includes maps, plans, and drawings related to recreational trail networks operated by the Philadelphia Parks and Recreation Department.

The collection contains a variety of document types, including surveys, master plans, construction documents, and landscaping plans. The bulk of the items in this collection range in date from 1994 to 2019.

Dates: n.d.

58th Street Greenway. Tree trench detail #1; tree trench detail #2. [2 sheets], c. 2011

 Item — Drawer M-7, Folder: 1
Scope and Contents From the Collection:

Collection includes maps, plans, and drawings related to recreational trail networks operated by the Philadelphia Parks and Recreation Department.

The collection contains a variety of document types, including surveys, master plans, construction documents, and landscaping plans. The bulk of the items in this collection range in date from 1994 to 2019.

Dates: c. 2011

Drawings for Construction of the 58th Street Greenway Connector. Includes: Index maps, location map, typical sections, intersection details, tree trench details, bioretention site details, summary, tabulation of quantities, and survey book. Small size. [41 sheets], c. 2011

 Item — Drawer M-7, Folder: 1
Scope and Contents From the Collection:

Collection includes maps, plans, and drawings related to recreational trail networks operated by the Philadelphia Parks and Recreation Department.

The collection contains a variety of document types, including surveys, master plans, construction documents, and landscaping plans. The bulk of the items in this collection range in date from 1994 to 2019.

Dates: c. 2011