Skip to main content

58th Street Greenway

 Subject
Subject Source: Local sources

Found in 8 Collections and/or Records:

58th Street Greenway. Design Charrette: showing approx. Cobb's Creek Park to Schuylkill River and 53rd Street to 59th Street, 2009 December 03

 Item — Drawer M-7, Folder: 1
Scope and Contents From the Collection:

Collection includes maps, plans, and drawings related to recreational trail networks operated by the Philadelphia Parks and Recreation Department.

The collection contains a variety of document types, including surveys, master plans, construction documents, and landscaping plans. The bulk of the items in this collection range in date from 1994 to 2019.

Dates: 2009 December 03

58th Street Greenway. Map showing 58th and 59th Streets from Cobb's Creek Parkway to Lindbergh Avenue. Highlighting: PWD Infiltration Trench, Meyer Rec Center, Presbyterian Apts, Save-A-Lot, and Bartram's Field, n.d.

 Item — Drawer M-7, Folder: 1
Scope and Contents From the Collection:

Collection includes maps, plans, and drawings related to recreational trail networks operated by the Philadelphia Parks and Recreation Department.

The collection contains a variety of document types, including surveys, master plans, construction documents, and landscaping plans. The bulk of the items in this collection range in date from 1994 to 2019.

Dates: n.d.

58th Street Greenway: overview, land agreement, correspondence, memos, articles & newsletters, 2009-2012

 File — Drawer 1-2
Scope and Contents From the Collection: The History Files collection contains research materials documenting parks, sites, structures, organizations, events, and individuals associated with the Fairmount Park System and Philadelphia Parks and Recreation. This collection compiles materials from diverse sources over time rather than representing the records of a single office or individual. Typical materials include correspondence, deeds, leases, newspaper clippings, photocopies of published articles and book excerpts, research...
Dates: 2009-2012

58th Street Greenway. Plan: Cover with location plan map; existing cross section with 2 proposed cross sections; 2 sheets of artistic renderings; concept design character; existing conditions, 2010 January 28

 Item — Drawer M-7, Folder: 1
Scope and Contents From the Collection:

Collection includes maps, plans, and drawings related to recreational trail networks operated by the Philadelphia Parks and Recreation Department.

The collection contains a variety of document types, including surveys, master plans, construction documents, and landscaping plans. The bulk of the items in this collection range in date from 1994 to 2019.

Dates: 2010 January 28

58th Street Greenway. Signing and Pavement Marking Plan. Half size [2 copies], n.d.

 Item — Drawer M-7, Folder: 1
Scope and Contents From the Collection:

Collection includes maps, plans, and drawings related to recreational trail networks operated by the Philadelphia Parks and Recreation Department.

The collection contains a variety of document types, including surveys, master plans, construction documents, and landscaping plans. The bulk of the items in this collection range in date from 1994 to 2019.

Dates: n.d.

58th Street Greenway. Signing and Pavement Marking Plan with Appendix. Small size, n.d.

 Item — Drawer M-7, Folder: 1
Scope and Contents From the Collection:

Collection includes maps, plans, and drawings related to recreational trail networks operated by the Philadelphia Parks and Recreation Department.

The collection contains a variety of document types, including surveys, master plans, construction documents, and landscaping plans. The bulk of the items in this collection range in date from 1994 to 2019.

Dates: n.d.

58th Street Greenway. Tree trench detail #1; tree trench detail #2, c. 2011

 Item — Drawer M-7, Folder: 1
Scope and Contents From the Collection:

Collection includes maps, plans, and drawings related to recreational trail networks operated by the Philadelphia Parks and Recreation Department.

The collection contains a variety of document types, including surveys, master plans, construction documents, and landscaping plans. The bulk of the items in this collection range in date from 1994 to 2019.

Dates: c. 2011

Drawings for Construction of the 58th Street Greenway Connector. Includes: Index maps, location map, typical sections, intersection details, tree trench details, bioretention site details, summary, tabulation of quantities, and survey book. [Small size], c. 2011

 Item — Drawer M-7, Folder: 1
Scope and Contents From the Collection:

Collection includes maps, plans, and drawings related to recreational trail networks operated by the Philadelphia Parks and Recreation Department.

The collection contains a variety of document types, including surveys, master plans, construction documents, and landscaping plans. The bulk of the items in this collection range in date from 1994 to 2019.

Dates: c. 2011