East Fairmount Park, Strawberry Mansion: Capital projects - rehabilitation phase I- construction bids and correspondence, 2009-2013, bulk: 2011-2012
File — Drawer: 3-2
Dates
- 2009-2013
- Majority of material found within 2011-2012
Extent
From the Collection: 175 Linear feet
Language of Materials
English
Repository Details
Part of the Fairmount Park Historic Resources Archive Repository
Contact:
1515 Arch Street, 10th Floor
Philadelphia Pennsylvania 19102 United States
215-683-0211
theresa.stuhlman@phila.gov
1515 Arch Street, 10th Floor
Philadelphia Pennsylvania 19102 United States
215-683-0211
theresa.stuhlman@phila.gov