Schuylkill River Park Trail Phase III - Design Development Submission: cover sheet; materials plan area-1; materials plan area-2; materials plan area-3; materials plan area-4; materials plan area-5; grading plan area-1; grading plan area-2; grading plan area-3; grading plan area-4; grading plan area-5; planting details; site details 1; site details 2; site details 3; site sections 1; site sections 2; site sections 3. [19 sheets], 2004 June
Item — Drawer: M-8, Folder: 3
Scope and Contents
From the Collection:
Collection includes maps, plans, and drawings related to recreational trail networks operated by the Philadelphia Parks and Recreation Department.
The collection contains a variety of document types, including surveys, master plans, construction documents, and landscaping plans. The bulk of the items in this collection range in date from 1994 to 2019.
Dates
- 2004 June
Creator
- Synterra (Organization)
Conditions Governing Access
This collection is open for research.
Extent
19 Sheets
Language of Materials
From the Collection: English
Creator
- Synterra (Organization)
Repository Details
Part of the Fairmount Park Historic Resources Archive Repository
Contact:
1515 Arch Street, 10th Floor
Philadelphia Pennsylvania 19102 United States
215-683-0211
theresa.stuhlman@phila.gov
1515 Arch Street, 10th Floor
Philadelphia Pennsylvania 19102 United States
215-683-0211
theresa.stuhlman@phila.gov