Skip to main content

Swann Memorial Fountain: Capital Projects - 1984-1986 restoration, 1985-1986

 File — Drawer: 7.3

Scope and Contents

Includes Design Feasibility Study by Cynthia Lister (1986) and Restoration and Revitalization of the Swann Memorial Fountain and Environs by George E. Patton, Inc. (1986).

Dates

  • 1985-1986

Conditions Governing Access note

This collection is open for research.

Extent

From the Collection: 5.0 Linear feet

Language of Materials

English