Synterra
Organization
Occupations
Found in 12 Collections and/or Records:
Schuylkill River Park Trail Phase III - Design Development Submission: cover sheet; materials plan area-1; materials plan area-2; materials plan area-3; materials plan area-4; materials plan area-5; grading plan area-1; grading plan area-2; grading plan area-3; grading plan area-4; grading plan area-5; planting details; site details 1; site details 2; site details 3; site sections 1; site sections 2; site sections 3. [19 sheets], 2004 June
Item — Drawer: M-8, Folder: 3
Scope and Contents
From the Collection:
Collection includes maps, plans, and drawings related to recreational trail networks operated by the Philadelphia Parks and Recreation Department.
The collection contains a variety of document types, including surveys, master plans, construction documents, and landscaping plans. The bulk of the items in this collection range in date from 1994 to 2019.
Dates:
2004 June
Smith Memorial Playground and Playhouse, Phase 1: DG1, disc golf course coordination plan; L0, tree removal protection plan. [2 sheets], 2005 July 11
Item — Drawer: F13 and F14, Folder: 2.2
Scope and Contents note
From the Collection:
This collection contains a variety of maps, plans and drawings relating to East and West Fairmount Park. Materials included in the collection are blueprints, bluelines, linens, mylars and paper. The collection contains diverse types of maps and plans, such as sewer plans, topographic plans, site plans, latitudinal and longitudinal plans, water main plans, street maps, and landscape plans. The collection is particularly strong in topographic plans, covering the entire region, and structural...
Dates:
2005 July 11