Schuylkill River Trail
Subject
Subject Source: Local sources
Found in 52 Collections and/or Records:
Schuylkill River: Schuylkill River Trail/ Boardwalk, Tidal Schuylkill Greenway [draft], 2013 May 02
Item — Shelf 23
Dates:
2013 May 02
Schuylkill River Trail, 1995-2012
File — Shelf Above Shelf 19, Box: 3, Folder: 16
Scope and Contents
From the Collection:
Collection includes published park maps, trail guides, campaigns, event programs and brochures, park guidebooks, and other published materials.
Dates:
1995-2012
Schuylkill River Trail: 58th Street and the Schuylkill River- Site Characterization/ Remedial Investigation Report/Cleanup Plan, 2011 July 8
Item — Shelf 24
Dates:
2011 July 8
Schuylkill River Trail Extension - South Street to Christian Street. Concept site plan. [1 sheet], 2013 September 6
Item — Drawer M-8, Folder: 3
Scope and Contents
From the Collection:
Collection includes maps, plans, and drawings related to recreational trail networks operated by the Philadelphia Parks and Recreation Department.
The collection contains a variety of document types, including surveys, master plans, construction documents, and landscaping plans. The bulk of the items in this collection range in date from 1994 to 2019.
Dates:
2013 September 6
Schuylkill River Trail: Get outdoors. Get out of town. Hit the trail!, n.d.
Item — Drawer M-1, Folder: 4
Scope and Contents note
From the Collection:
This collection contains a wide range of items in terms of both content and format. The strongest series contains lithographs, etchings and engravings of various Fairmount Park locations and features- particularly views of and from Historic Houses, park features and the Fairmount Water Works. The bulk of this collection is from the mid to late 19th Century. Eight original carborundum and charcoal prints created by prominent local artists for the Works Progress Administration's...
Dates:
n.d.
Schuylkill River Trail: Phase III-B North Landscape Improvements to the Schuylkill Trail, 2006 December 13
Item — Shelf 24
Dates:
2006 December 13
Schuylkill River Trail: Phase II/III Environmental Site Assessment Report Fairmount Park Bikeway Enhancements Shawmont Avenue to Montgomery County Line, 2010 December
Item — Shelf 24
Dates:
2010 December
Schuylkill River Trail, Shawmont to MontCo: Fairmount Bikeway Enhancements Shawmont Avenue to Montgomery County Line - Wall #1, Wall # 2, Wall #3" - Conceptual Type, Size & Location Study [3 small volumes; clipped together], 2011 February 24
Item — Shelf 24
Dates:
2011 February 24