Drawer MA-1
Container
Contains 63 Results:
Manayunk Canal. Contract drawings for Flat Rock Dam - Manayunk Schuylkill Canal - Improvements to Intake Channel Wall and Spillway: title sheet - index of drawings (G-1); existing conditions site plan; existing walls sections and profile; site access and contractor laydown/staging area plan; erosion and sediment control plan; erosion and sediment control details; erosion and sediment control details (2); erosion and sediment control notes; proposed conditions site plan; proposed conditions layout and geometry plan; proposed conditions sections; proposed conditions sections (2); training wall enlarged plans and elevations; training wall sections and details; diversion structure sections; ramp details; operations building plans, sections, and details; cast iron sluice gate sections; concrete demolition plans and sections; foundation: rock preparation and concrete key construction; typical spillway geometry section, construction and anchor details; typical spillway reinforcing and joint details; training wall sections and details; training wall sections and details (2); dam post-tensioned anchor layout and notes; sediment/debris management sluiceway plan and sections; diversion structure sections; diversion structure sections (2); diversion structure sections (3); intake structure plans; intake structure sections; intake structure sections (2); stop log and trash rack plan, sections, and details; stop log and trash rack sections and details (2); miscellaneous sections and details; operations building plan and sections; ramp details; tie back and wale beam details; general notes for structural design, construction, and restoration. [39 sheets], 2012 September 12
Item — Drawer: MA-1, Folder: 5
Scope and Contents note
From the Collection:
This collection contains maps, drawings and plans of the Manayunk region- including the town of Manayunk, Venice Island, and Manayunk Canal. The bulk of the collection is focused on the Manayunk Canal, particularly recent restoration plans.
Dates:
2012 September 12
Manayunk Canal Towpath. Manayunk Schuylkill Canal Restoration Project North and South Bank Canal Edging - Phase IIIA Lock Street to West of Parker Ave: cover sheet (CS-1); site plan sta. 88+50 to 78+00 (C1001); site plan sta. 64+00 to 49+00 (C1002); site plan sta. 49+00 TO 34+00 (c1003); site plan sta. 34+00 TO 25+00 (C1004); site plan sta. 53+00 to 51+50 Leverington Street (C1005); sections and details (C6001); sections and details (C6002): sections and details (C6003); sections and details (C6004); sections and details (C6005); general notes (C6006); sections and details Leverington Street (C6007). [13 sheets], 2002 October 22
Item — Drawer: MA-1, Folder: 4
Scope and Contents note
From the Collection:
This collection contains maps, drawings and plans of the Manayunk region- including the town of Manayunk, Venice Island, and Manayunk Canal. The bulk of the collection is focused on the Manayunk Canal, particularly recent restoration plans.
Dates:
2002 October 22
Manayunk Bridge Trail. Lighting and conduit plan: E-1; E-2; E-3; E-4; E-5; E-6; E-7; E-8. [8 sheets], 2014 January 8
Item — Drawer: MA-1, Folder: 1
Scope and Contents note
From the Collection:
This collection contains maps, drawings and plans of the Manayunk region- including the town of Manayunk, Venice Island, and Manayunk Canal. The bulk of the collection is focused on the Manayunk Canal, particularly recent restoration plans.
Dates:
2014 January 8