Skip to main content

Wissahickon Environmental Education and Visitors Center, 726 East Wigard Avenue: Cover sheet (A0.0); existing conditions plan (C-1); site demolition plan (C-2); civil engineering site plan (C-3); enlarged site plan at Henry Avenue (C-3.1); enlarged site plan at building (C-3.2); grading plan (C-4); enlarged grading plan at building (C-4.1); drainage and domestic water plan (C-5); enlarged drainage plan (C-5.1); erosion control plan (C-6); civil engineering details (C7.0); civil engineering details (C7.1); civil engineering details (C7.2); civil engineering details (C7.3); civil engineering details (C7.4); tree protection, removal and arboriculture plan; landscape plan; planting details; landscape details (L4); landscape details (L5); basement and foundation plans; first floor plan; roof plan; reflected ceiling plans; exterior elevation - south; exterior elevations - east and west; exterior elevation - north; building sections - long; building sections - short; exterior wall sections (A4.0); exterior wall sections (A4.1); exterior wall sections (A4.2); fireplace section and details; exterior wall details; window details; door details; roof and dormer details; roof details; roof and siding details; misc. exterior details - bridge, signage, etc.; interior elevations (A6.0); interior elevations (A6.1); interior elevations (A6.2); partition types and finish schedules; interior details; millwork details (A8.0); millwork details (A8.1); millwork details (A8.2); graphics; graphics details; foundation plan; partial first floor framing plan; roof framing plans; sections (S2.0); sections (S2.1); typical concrete details; typical steel details; mechanical symbols, legends and notes; first floor ductwork plan; basement - mech. room ductwork and piping plan; mech. details and piping diagram; mech. details (M4); mech. details (M5); mech equipment schedules; ATC controls (M7); ATC controls (M8); plumbing symbols, legend notes, schedules and details; basement and first floor - sanitary waste and vent piping plans; basement and first floor - hot and cold water piping plans; electrical symbols legends, notes and panel schedules; basement and first floor power plan; basement and first floor lighting plan; site lighting plan; single line diagram and details. [75 sheets], 2000 April 10

 Item — Drawer: W13 and W14, Folder: 2

Dates

  • 2000 April 10

Creator

Conditions Governing Access note

This collection is open for research.

Extent

75 Sheets

Language of Materials

English

Repository Details

Part of the Fairmount Park Historic Resources Archive Repository

Contact:
1515 Arch Street, 10th Floor
Philadelphia Pennsylvania 19102 United States
215-683-0211