Skip to main content

Plans for Poquessing Creek Trail: pedestrian bridge crossing (C-1); pedestrian bridge details (C-2); erosion and sediment control plan (C-4); erosion and sediment control details (C-5). [4 sheets], 2009 February 12

 Item — Drawer: M-8, Folder: 2

Scope and Contents

From the Collection:

Collection includes maps, plans, and drawings related to recreational trail networks operated by the Philadelphia Parks and Recreation Department.

The collection contains a variety of document types, including surveys, master plans, construction documents, and landscaping plans. The bulk of the items in this collection range in date from 1994 to 2019.

Dates

  • 2009 February 12

Conditions Governing Access

This collection is open for research.

Extent

4 Sheets

Language of Materials

English

Repository Details

Part of the Fairmount Park Historic Resources Archive Repository

Contact:
1515 Arch Street, 10th Floor
Philadelphia Pennsylvania 19102 United States
215-683-0211