Skip to main content

Manayunk Canal Towpath. Manayunk Schuylkill Canal Restoration Project North and South Bank Canal Edging - Phase IIIA Lock Street to West of Parker Ave: cover sheet (CS-1); site plan sta. 88+50 to 78+00 (C1001); site plan sta. 64+00 to 49+00 (C1002); site plan sta. 49+00 TO 34+00 (c1003); site plan sta. 34+00 TO 25+00 (C1004); site plan sta. 53+00 to 51+50 Leverington Street (C1005); sections and details (C6001); sections and details (C6002): sections and details (C6003); sections and details (C6004); sections and details (C6005); general notes (C6006); sections and details Leverington Street (C6007), 2002 October 22

 Item — Drawer: MA-1, Folder: 4

Scope and Contents note

From the Collection:

This collection contains maps, drawings and plans of the Manayunk region- including the town of Manayunk, Venice Island, and Manayunk Canal. The bulk of the collection is focused on the Manayunk Canal, particularly recent restoration plans.

Dates

  • 2002 October 22

Conditions Governing Access note

This collection is open for research.

Extent

13 Sheets

Language of Materials

English

Repository Details

Part of the Fairmount Park Historic Resources Archive Repository

Contact:
1515 Arch Street, 10th Floor
Philadelphia Pennsylvania 19102 United States
215-683-0211