Skip to main content

Manayunk Canal Towpath. Manayunk Schuylkill Canal Restoration Project North and South Bank Canal Edging - Phase IIIA Lock Street to West of Parker Ave: cover sheet (CS-1); site plan sta. 88+50 to 78+00 (C1001); site plan sta. 64+00 to 49+00 (C1002); site plan sta. 49+00 TO 34+00 (c1003); site plan sta. 34+00 TO 25+00 (C1004); site plan sta. 53+00 to 51+50 Leverington Street (C1005); sections and details (C6001); sections and details (C6002): sections and details (C6003); sections and details (C6004); sections and details (C6005); general notes (C6006); sections and details Leverington Street (C6007). [13 sheets], 2002 October 22

 Item — Drawer: MA-1, Folder: 4

Scope and Contents note

From the Collection:

This collection contains maps, drawings and plans of the Manayunk region- including the town of Manayunk, Venice Island, and Manayunk Canal. The bulk of the collection is focused on the Manayunk Canal, particularly recent restoration plans.

Dates

  • 2002 October 22

Conditions Governing Access note

This collection is open for research.

Extent

13 Sheets

Language of Materials

From the Collection: English

Repository Details

Part of the Fairmount Park Historic Resources Archive Repository

Contact:
1515 Arch Street, 10th Floor
Philadelphia Pennsylvania 19102 United States
215-683-0211