Skip to main content

Planning and design of Schuylkill Trail. Phase One. Cover Sheet, drawing index, general information, architect information, engineer information; Site information + analysis, L1-2.2; Trail layout studies, L3-3.2; Landscape schematic design, L4-5.1; Landscape design development, L6-8 (2 copies). [52 sheets; 26 unique sheets], 2010 March 29

 Item — Drawer: M-8, Folder: 4

Scope and Contents

From the Collection:

Collection includes maps, plans, and drawings related to recreational trail networks operated by the Philadelphia Parks and Recreation Department.

The collection contains a variety of document types, including surveys, master plans, construction documents, and landscaping plans. The bulk of the items in this collection range in date from 1994 to 2019.

Dates

  • 2010 March 29

Creator

Conditions Governing Access

This collection is open for research.

Extent

78 Sheets

Language of Materials

English

Repository Details

Part of the Fairmount Park Historic Resources Archive Repository

Contact:
1515 Arch Street, 10th Floor
Philadelphia Pennsylvania 19102 United States
215-683-0211