Skip to main content

Simone and Jaffe Incorporated

 Organization

Occupations

Found in 3 Collections and/or Records:

Boathouse Row, Plaisted Hall: Master Plan: Phase 1 - Analysis, Programming, & Land Use; Boathouse Row Master Plan: Phase 1 - Analysis, Programming, Land Use & Policy, 1992 September 22

 Item — Shelf: 14
Scope and Contents From the Collection: This collection contains technical reports, studies, and project documentation related to Fairmount Park system properties and Philadelphia recreation facilities. Materials include historic structure reports, cultural landscape inventories, archaeological investigations, preservation and conservation evaluations, building condition assessments, master plans, environmental site assessments, engineering reports, project manuals and specifications, feasibility studies, maintenance and operation...
Dates: 1992 September 22

Wissahickon Trails Master Plan: trail use plan; landmarks and features; trails inventory; priority improvements, 1995 December

 Item — Drawer: M-8, Folder: 7
Scope and Contents From the Collection:

Collection includes maps, plans, and drawings related to recreational trail networks operated by the Philadelphia Parks and Recreation Department.

The collection contains a variety of document types, including surveys, master plans, construction documents, and landscaping plans. The bulk of the items in this collection range in date from 1994 to 2019.

Dates: 1995 December