Franklin & Lindsey
Organization
Occupations
Found in 23 Collections and/or Records:
Sewer Reconstruction Project - Midvale Avenue between the Schuylkill River and Ridge Avenue and Ridge Avenue between Midvale Avenue and Indian Queen Lane, 1953 June 8
Item — Drawer: F2, Folder: 5
Scope and Contents note
From the Collection:
This collection contains a variety of maps, plans and drawings relating to East and West Fairmount Park. Materials included in the collection are blueprints, bluelines, linens, mylars and paper. The collection contains diverse types of maps and plans, such as sewer plans, topographic plans, site plans, latitudinal and longitudinal plans, water main plans, street maps, and landscape plans. The collection is particularly strong in topographic plans, covering the entire region, and structural...
Dates:
1953 June 8
Sewer reconstruction project: Race Street from 19th Street to 20th Street, 1965
Item — Drawer: F20, Folder: 3.3
Scope and Contents note
From the Collection:
This collection contains a variety of maps, plans and drawings relating to East and West Fairmount Park. Materials included in the collection are blueprints, bluelines, linens, mylars and paper. The collection contains diverse types of maps and plans, such as sewer plans, topographic plans, site plans, latitudinal and longitudinal plans, water main plans, street maps, and landscape plans. The collection is particularly strong in topographic plans, covering the entire region, and structural...
Dates:
1965
#W24-01 (Wissahickon): ID: 701: Plan revising the lines and grades of City Plan no. 297 and portions of City Plan nos. 286 and 288, 1949 December 21
Item — Shelf: BR-30.1
Identifier: 701
Dates:
1949 December 21
