RMJM Hillier
Organization
Occupations
Found in 2 Collections and/or Records:
Smith Memorial Playground and Playhouse Phase 3 Renovation Project: cover letter, phase 3 overall site plan; phase 3 infant and toddler play area illustrative plan; phase 3 infant and toddler illustrative planting plan; prepared by Hillier Architecture. [4 sheets], 2007 March
Item — Drawer: F13 and F14, Folder: 2.2
Identifier: FP.2019.0
Scope and Contents note
From the Collection:
This collection contains a variety of maps, plans and drawings relating to East and West Fairmount Park. Materials included in the collection are blueprints, bluelines, linens, mylars and paper. The collection contains diverse types of maps and plans, such as sewer plans, topographic plans, site plans, latitudinal and longitudinal plans, water main plans, street maps, and landscape plans. The collection is particularly strong in topographic plans, covering the entire region, and structural...
Dates:
2007 March
Smith memorial Playground: L100, gateway planting plan; L101, gateway lighting plan; L200, gateway details; L300, gateway details [4 sheets], 2009 September 11
Item — Drawer: F13 and F14, Folder: 1.1
Identifier: FP.2019.0
Scope and Contents note
From the Collection:
This collection contains a variety of maps, plans and drawings relating to East and West Fairmount Park. Materials included in the collection are blueprints, bluelines, linens, mylars and paper. The collection contains diverse types of maps and plans, such as sewer plans, topographic plans, site plans, latitudinal and longitudinal plans, water main plans, street maps, and landscape plans. The collection is particularly strong in topographic plans, covering the entire region, and structural...
Dates:
2009 September 11